RUSH Celebrates 37 Year Anniversary

Reflecting on 37 Years of Performance with Integrity On May 1, 2021, RUSH Construction, Inc. celebrated its 37 year anniversary. In 2020, Space Coast Business magazine published a story titled “The Growth & Diversification of RUSH Construction”, which highlights how Founder and Chairman of the Board, Ed Rabel, started the company in 1984 and how…

Medal of Honor Hallway, Special Operations Command, MacDill AFB

Project Location: Tampa, FL Facility Size: 2,000 s.f. Duration: 3 Months Contract: $1,540,814.00 Owner: Special Operations Command RUSH served as the General Contractor for the renovation of several areas throughout the Special Operations Command (SOCOM) campus. This included the complete renovation of the existing Medal of Honor recipient memorial. This project is located in a…

Embraer Aero Seating Facility

This Design/Build GMP project entailed the complete design and construction of a 40,500 SF Airplane Seating Manufacturing Facility with administrative and employee locker rooms as well as a 14,000 SF Administrative and Engineering Support Facility. The project included the full development of a 15 acre site, including all underground utilities for both facilities, parking lots,…

CPA S.R. 401 Shoreline Stabilization

The CPA S.R. 401 Shoreline Stabilization project consisted of the installation of 2,900 linear feet of Rip/Rap revetment along the Banana River in order to stabilize the shoreline along SR 401. The shoreline stabilization is installed at a 2:1 (horizontal to vertical) slope to rectify erosion and roadside infrastructure. The project included erosion control and…

RUSH Construction, Inc. Achieves World-Class Safety Standards Through Diamond Level ABC STEP Program

RUSH Construction, Inc. today announced it has achieved Diamond level in Associated Builders and Contractor’s STEP Safety Management System, meaning the company is 655% safer than the industry average. Founded more than three decades ago, STEP has evolved into a world-class safety program that dramatically improves safety performance among construction industry participants. STEP participants measure…

Ron Norris Honda Dealership

The Ron Norris Honda Dealership project located along Highway US 1 in downtown Titusville was a three-phase, design-build project constructed concurrently with the Ron Norris Buick/GMC Dealership project. The design and construction of the 20,000 square foot Ron Norris Honda Dealership was modeled to Honda’s Gen 3 Image Program governed by Interbrand Design Forum. RUSH…