CPA Cove Embankment Repairs – Milliken’s Site

RUSH Marine was awarded this project as part of our CPA Continuing Services-Waterside contract. We self-performed all of the work for this project. These repairs were due to previous hurricane related weather conditions. RUSH Marine furnished the labor, materials, and marine equipment necessary to remove and repair approximately 200 LF of slope embankment within the Canaveral…

Rebuild East Abutment Protection – Jay Jay Railroad

Location: Kennedy Space Center Owner: NASA Duration: 12 Days Contract Value: $700,000 General Scope: Provide emergency repairs and install two replacement pile bents at the Jay-Jay Railroad Bridge. This critical project had a 28-calendar day schedule. Through extensive coordination and expediting efforts, equipment was mobilized, materials were procured and work was completed ahead of schedule.…

CPA S.R. 401 Shoreline Stabilization

Installation of 2,900 linear feet of Rip/Rap revetment along the Banana River in order to stabilize the shoreline along SR 401. The shoreline stabilization is installed at a 2:1 (horizontal to vertical) slope to rectify erosion and roadside infrastructure. Project includes erosion control and turbidity barriers, soil excavation (4,500 CY), fill material (20,100 CY), installation…

Canaveral Locks East West Guide Wall Repair

This Bid/Build project consisted of the repair for the Canaveral Locks East and West timber approach wall to prevent failure and restore the wall to an operational condition. Approximately 396 new fiberglass/concrete composite marine pilings were installed to replace the existing piles. Fiber-reinforced structural plastic lumber (SPL) fenders, whalers and supports were installed to support…