Orlando Health Imaging Center

RUSH Construction served as the Design-Build General Contractor for the new outpatient imaging center for Orlando Health Imaging Center located at 1800 Orange Avenue. The facility is 7,500 square feet, with initially anticipated exterior materials being EIFS on metal framing with tinted, insulated glass and conditioning via new roof-top air handling unit(s). The project includes…

Orlando Health, Inc.

RUSH served as the Design Builder for two (2) medical suite renovations located at Lucerne Medical Center/Orlando Health in Orlando, Florida. Suite 405 was reconfigured for pediatric behavioral health offices. Suite 600 was reconfigured for use as a neuroscience clinic. The combined square footage of both suites is 6,072 SF.

Halifax Health Medical Center in Daytona Beach – Completed Projects

Completed Projects at Halifax Health Medical Center in Daytona Beach: Halifax Regional Center for Oncology (ROC) Finishes Emergency Power Upgrade – This project took place in two main Electrical Rooms and Patient Rooms on the 2nd, 3rd and 5th floor of the Port Orange Medical Center. The construction includeed upgrading/changing out components and changing circuit wiring from regular…

Cape Canaveral Hospital Neurology Clinic

​RUSH served as General Contractor for the CCH Neuro Clinic. This 3,130 sf project was completed in 3 months with no time extensions. The project required careful planning and scheduling being it is above and below occupied areas and heavy flow of traffic. The project consisted of a selected Demo on all restrooms, exam rooms,…

DaVita Healthcare at Titus Landing 3rd Floor

Project Location: Titusville, FL Facility size: 2,153 SF Build Out Duration: 5 Months RUSH Construction (RUSH) served as the general contractor for the interior build-out of a portion of the Parrish Healthcare Medical Office Building at Titus Landing (also constructed by RUSH Construction, Inc.). The new facility is a Home Hemodialysis clinic where patients and…

Apollo Surgery Center Build-Out

RUSH Construction served as the Contractor and provided some additional Design-Build options for the build-out of the second floor 9,850 s.f. over the existing operational Surgery Center. This AHCA compliant project consisted of creating three (3) more operating rooms and all the required departments and equipment needed to support this service. This Build-Out also included…

Parrish Medical Center – Health Village East

RUSH Construction, Inc is currently helping Parrish Medical Center expand their healing environment outdoors. Health Village East will create a community park, connecting the hospital with the Parrish Health Village and the Chain of Lakes. The park will provide a unique healing experience with fitness stations, a 1/3 mile walking trail, ability for group fitness classes and physical therapy sessions, community event venues and more.