Kennedy Space Center – Replacement of Feeders and Ducts
RUSH completed the Replace Feeders & Ducts, Contractor Road project at Kennedy Space Center, Florida in March 2011 roughly six months ahead of schedule.
RUSH completed the Replace Feeders & Ducts, Contractor Road project at Kennedy Space Center, Florida in March 2011 roughly six months ahead of schedule.
Construction of a 5,949 sf single story CMU facility for Para-Rescue Training at Patrick AFB, FL. was a $2.2 million dollar project…
RUSH-LINK TWO JV completed the Add/Alter Zodiac Storage Bldg. 689 project in April 2012. The work performed under this project consisted of providing the labor, equipment, and materials necessary to make miscellaneous structural, architectural, mechanical, electrical, and life safety improvements to Building 689 Zodiac Storage at Patrick AFB, Florida…
RUSH-LINK TWO JV completed the 920th Life Support Bldg. 624 HVAC Renovation project May 2012: the removal of 3 constant volume DX air handling units and condensers, 11 variable air volume boxes, 2 main distribution power panels, and 1 112.5 kVA pad mounted transformer.
Project consisted of removal and replacement of the complete horizontal fall restraint cable system for the Operational and Checkout (O&C) facility at the Kennedy Space Center. The newly installed horizontal lifeline system is a fully engineered fall restraint system that complies with all ANSI requirement. Two systems are being replaced in the high bay area…
Installation of roof fall protection systems on 5 metal roof systems at Kennedy Space Center.
Fire Station No. 2 was a Design/Build 20,000 sf fire station. Facility includes drive-thru bays for emergency vehicles, sleeping quarters for emergency personnel, and dining facilities.
Replaced four transformers and relocated one transformer at various facilities at the Kennedy Space Center.
Located less than a mile from the beach, this facility is elevated almost 10′ on 100+ concrete piles driven over 30′ into the ground and is surrounded by a 4′ thick and 4′ tall solid concrete barrier.
RUSH-LINK Joint Venture (RLJV) was awarded a contract by URS Federal Technical Services Inc. for the Stabilization of West Security Fence at Fuel Storage Area (FSA #1) at the Cape Canaveral Air Force Station.