Canaveral Port Authority Cruise Terminal 8 & 10 Waterside Modifications
RUSH Marine has been awarded as the General Contractor for the $5.269 Million waterside modifications project at the Disney Cruise Terminal CT 8 and Cruise Terminal 10. The project commenced in July of 2020, with an anticipated completion date of May 2021.
Cocoa Village Riverfront Park Waterside Improvements
RUSH Marine was awarded as the General Contractor in January 2020 for the Cocoa Village Riverfront Park waterside improvements. This project consisted of a complete installation of a 650 foot seawall and replacement of the two wooden piers with concrete overlooks. The project was completed in June 2020, and opened to the public in time…
RUSH Marine – Shore Stabilization of Area 1, MCSF Blount Island – Jacksonville, FL
RUSH Marine, LLC was awarded the Shoreline Stabilization of Area 1, MCSF Blount Island project in Jacksonville, FL. This project included clearing and grubbing, excavation, security fencing and relocation, steel sheet pile bulkhead wall with tie-back system, geotextile fabric, crushed aggregate road, backfill and compaction, sodding, planting and establishment of trees and other work incidental…
Vilano Beach Boat Ramp Dock Repairs
RUSH Construction Inc. D.B.A. RUSH Marine self-performed the work scope associated with this project. Scope of Work included removing two 60’ floating docks, two 24’ long aluminum walkways and replacing with similar new components. The project was expected to take 16 weeks for delivery with 60 days allowed for construction. Total contract time allowed was…
CPA Cove Embankment Repairs – Milliken’s Site
RUSH Marine was awarded this project as part of our CPA Continuing Services-Waterside contract. We self-performed all of the work for this project. These repairs were due to previous hurricane related weather conditions. RUSH Marine furnished the labor, materials, and marine equipment necessary to remove and repair approximately 200 LF of slope embankment within the Canaveral…
Rebuild East Abutment Protection – Jay Jay Railroad
Location: Kennedy Space Center Owner: NASA Duration: 12 Days Contract Value: $700,000 General Scope: Provide emergency repairs and install two replacement pile bents at the Jay-Jay Railroad Bridge. This critical project had a 28-calendar day schedule. Through extensive coordination and expediting efforts, equipment was mobilized, materials were procured and work was completed ahead of schedule.…
MacDill Air Force Base – Pier Lighting Project
$2.1 million approach light pier at the end of Runway 04 at MacDill Air Force Base. This design job included demolition of the existing approach light pier, including the concrete frame house.