This $2.1 million dollar project consisted of removal of existing runway edge lighting fixtures and wiring. The design required a new electrical service, backup generator, utility vault, conduit, wire and various airfield navigational aids.
“This contractor performed above average work and was responsive to the requirements of the Government. I would recommend using RUSH-PEAK for future requirements.” – Jeffrey A. Agee, P.E. Resident Engineer, MacDill AFB, FL