RUSH Construction, Inc. served as the General Contractor for sixteen (16) Beach Crossover locations ranging from Cape Canaveral to Cocoa Beach. These Brevard County crossover locations were damaged due to recent Hurricane conditions.
This project involved the replacement and repair of all 16 beach crossover structures allowing the public to have proper access of the beach. All 16 locations were completed by the start of turtle season in March 2020.