$2.1 million approach light pier at the end of Runway 04 at MacDill Air Force Base. This design job included demolition of the existing approach light pier, including the concrete frame house.
“On site Quality Control representation was outstanding. In addition, excellent coordination with Subcontractor, and engineer during pile driving operations. Coordination and approvals with Engineer of record were well documented.”
-Dennis Newell, Resident Engineer, U.S. Army Corps of Engineers