ADD/ALTER-Facility For Combat Rescue Officer Bed Down, Patrick Air Force Base, Florida
Construction of a 5,949 sf single story CMU facility for Para-Rescue Training at Patrick AFB, FL. was a $2.2 million dollar project. The construction consisted of CMU wall system, light-gage structural metal roof trusses, metal roof decking, insulated concrete tiled roofing system and interior finishes. The building also includes required mechanical and electrical utility systems, communication systems, fire detection and suppression systems, storm water drainage and retention systems, and related site work and earthwork.
“This contractor performed above average work and was responsive to the requirements of the Government. I would recommend using RUSH-PEAK for future requirements.”
-Dennis Newell, Resident Engineer, U.S. Army Corps of Engineers