YMCA Family Center Titusville, Florida
This 22,000 sq ft addition and renovation project included the demolition of an existing facility and extensive site work that converted a low lying, unusable area into a retention pond and athletic fields.
This 22,000 sq ft addition and renovation project included the demolition of an existing facility and extensive site work that converted a low lying, unusable area into a retention pond and athletic fields.
The interior renovation and addition to the Dr. Phillips YMCA included the addition of a 3200 square foot multipurpose room, a 1200 square foot bath house/gazebo, and renovation of the existing main entry area to include the interior and exterior.
DEOMI is a 90,000 SF, two-story, design-build, education and training facility that will accommodate more than 400 students. The structure consisted of precast concrete wall panels and a structural steel frame…
The Utility Shop Facility is a 25,000 square foot building being constructed in the shadows of the Vertical Assembly Building (VAB).
The Life Support Facility will serve as the operation center for the SCAPE procedures at the Kennedy Space Center. NASA’s Self Contained Atmospheric Protective Ensemble (SCAPE) suits will be processed in this new 22,000 square foot facility. The $5.7 million dollar building is constructed of concrete, tilt-wall panels and a structural steel frame.
This project featured a complete interior renovation of Ron Norris Ford’s 9,000 square foot Showroom with an additional 1,000 square feet added to the structure by the enclosure of an existing canopy. The fully renovated 10,000 square foot Showroom features a designated customer lounge, business center, kid’s play area, restrooms, and new service center, as well as high-end finishes…
The new American Police Hall of Fame and Museum is located across from the Astronaut Hall of Fame on a five acre site at VectorSpace.
This project consists of the construction of a new 4 level pre-cast pretensioned concrete parking garage in support of the SOCOM (Special Operations Command) at MacDill AFB, FL…
The Barn Light Electric Manufacturing Facility is a two-phase, design-build project involving the renovation of an existing 38,000 SF facility and new construction of 10,000 SF providing Barn Light Electric Company with a primary manufacturing facility for their classic vintage light fixtures.
The renovation and addition of the 23,000 square foot South Orlando YMCA was RUSH Construction’s third major renovation and construction project for the Central Florida YMCA. Especially challenging, was the constructing of the architecturally difficult 9,000 square foot elliptical wellness area.