Shuttle Landing Facility Fuel Farm Storage

RUSH was awarded the installation of a 20,000-gallon Jet-A fuel storage tank on the apron of the former Shuttle Landing Facility. The project consisted of site work, a spill containment area, bollards to protect the fuel tanks, and associated electrical work to tie the new system into the existing electrical system. The tank allows the…

Jetty Park Stormwater

RUSH Construction Inc. was awarded the Jetty Park Stormwater project under their Continuing Services Landside Contract with the Canaveral Port Authority. This fantastic local project was at Jetty Park, one of our local beach tourism and fishing hotspots in Brevard County. The Jetty Park Project featured upgrades to the storm drainage system, and lowering the…

Ron Norris Ford Renovations

This project featured a complete interior renovation of Ron Norris Ford’s 9,000 square foot Showroom with an additional 1,000 square feet added to the structure by the enclosure of an existing canopy. The fully renovated 10,000 square foot Showroom features a designated customer lounge, business center, kid’s play area, restrooms, and new service center, as well as high-end finishes…

YMCA South Orlando

The renovation and addition of the 23,000 square foot South Orlando YMCA was RUSH Construction’s third major renovation and construction project for the Central Florida YMCA. Especially challenging, was the constructing of the architecturally difficult 9,000 square foot elliptical wellness area.

Playalinda Brewing Company – Titusville, FL

Playalinda Brewing Company, located in a historic building from 1910, is North Brevard’s first microbrewery. RUSH worked together with the owners of this building to blend a state-of-the-art brewing system in a historic building. Due to the building’s age, extensive interior renovations were required for this project, while making every effort to preserve the space…