Patrick Air Force Base – DEOMI
DEOMI is a 90,000 SF, two-story, design-build, education and training facility that will accommodate more than 400 students. The structure consisted of precast concrete wall panels and a structural steel frame…
DEOMI is a 90,000 SF, two-story, design-build, education and training facility that will accommodate more than 400 students. The structure consisted of precast concrete wall panels and a structural steel frame…
The Life Support Facility will serve as the operation center for the SCAPE procedures at the Kennedy Space Center. NASA’s Self Contained Atmospheric Protective Ensemble (SCAPE) suits will be processed in this new 22,000 square foot facility. The $5.7 million dollar building is constructed of concrete, tilt-wall panels and a structural steel frame.
The Utility Shop Facility is a 25,000 square foot building being constructed in the shadows of the Vertical Assembly Building (VAB).
Construction of approximately 14,000 sf of secure Joint Air Force, Army, Navy area, 1,700 sf of flight simulator area and Life Support Functions.
The project required to provide a single-story Combat Training Facility and remodel an existing Combat Training Facility at MacDill AFB in Tampa, Florida.
This project consists of the construction of a new 4 level pre-cast pretensioned concrete parking garage in support of the SOCOM (Special Operations Command) at MacDill AFB, FL…
RUSH completed this critical infrastructure improvement project for the water tower and sound suppression piping at Launch Complex 39B in September 2012. These repairs are an essential part of various infrastructure improvements to Launch Complex 39B for NASA’s future space missions.
The new Design/Build Explosive Ordnance Disposal Facility is required to accommodate 18 full time personnel and 3 Government vehicles. The facility includes spaces for administrative offices and training, conditioned storage/shops spaces and vehicle garage bays.
The scope of this project consisted of the renovation of the existing Dive Tank Facility, KW-400, located on the Special Forces Underwater Operations base at Trumbo Point NAS Key West, FL. RUSH-PEAK JV completed all renovation activities in February 2011. The scope of the renovation work activities included the replacement of the existing tank lights…
Three decades ago, RUSH Construction was tasked with creating Lightning Mitigation Towers for Launch Complex 40 and 41. These towers are designed to defend the rockets and service structures from lightning strikes that could ultimately delay a mission and/or damage vital launch hardware. Standing 35-stories high and creating an umbrella-like shield with catenary cables, the…