As a guest on the podcast, John Murphy International, RUSH President & CEO William Chivers, discusses the history of RUSH, thoughts on leadership, and the pivotal transfer of being owner-owned to being an employee-owned firm. William talks about how seriously he takes the responsibility of having 35 people relying upon RUSH for their livelihood and this shapes the…

Embraer Executive Aircraft Security Checkpoint

​RUSH Construction Inc. was awarded the Design-Build contract for Embraer’s Security Checkpoint project on June 8, 2018, and served as the design-builder for the security checkpoint project at Embraer’s campus located at the Melbourne International Airport. The project consisted of installing two premanufactured guard stations, associated site work and utility work. The security checkpoints are an…

MacDill Outdoor Recreation Facility Complex

RUSH served as the General Contractor for the construction of 2 facilities located on a 2.5 acre site which included: Earthwork; utilities; parking; entrances; pedestrian and vehicular paving; drainage; grading and site lighting. Retail Building: 4,188 square feet new single story construction for Retail purpose. Included: Shallow concrete foundations, concrete slab on grade, concrete masonry…

Cape Canaveral Hospital Neurology Clinic

​RUSH served as General Contractor for the CCH Neuro Clinic. This 3,130 sf project was completed in 3 months with no time extensions. The project required careful planning and scheduling being it is above and below occupied areas and heavy flow of traffic. The project consisted of a selected Demo on all restrooms, exam rooms,…

Vilano Beach Boat Ramp Dock Repairs

RUSH Construction Inc. D.B.A. RUSH Marine self-performed the work scope associated with this project. Scope of Work included removing two 60’ floating docks, two 24’ long aluminum walkways and replacing with similar new components. The project was expected to take 16 weeks for delivery with 60 days allowed for construction. Total contract time allowed was…

CPA Cove Embankment Repairs – Milliken’s Site

RUSH Marine was awarded this project as part of our CPA Continuing Services-Waterside contract. We self-performed all of the work for this project. These repairs were due to previous hurricane related weather conditions. RUSH Marine furnished the labor, materials, and marine equipment necessary to remove and repair approximately 200 LF of slope embankment within the Canaveral…

Rebuild East Abutment Protection – Jay Jay Railroad

​Location: Kennedy Space Center Owner: NASA Duration: 12 Days Contract Value: $700,000 General Scope: Provide emergency repairs and install two replacement pile bents at the Jay-Jay Railroad Bridge. This critical project had a 28-calendar day schedule. Through extensive coordination and expediting efforts, equipment was mobilized, materials were procured and work was completed ahead of schedule.…