MacDill Outdoor Recreation Facility Complex

RUSH served as the General Contractor for the construction of 2 facilities located on a 2.5 acre site which included: Earthwork; utilities; parking; entrances; pedestrian and vehicular paving; drainage; grading and site lighting. Retail Building: 4,188 square feet new single story construction for Retail purpose. Included: Shallow concrete foundations, concrete slab on grade, concrete masonry…

Cape Canaveral Hospital Neurology Clinic

​RUSH served as General Contractor for the CCH Neuro Clinic. This 3,130 sf project was completed in 3 months with no time extensions. The project required careful planning and scheduling being it is above and below occupied areas and heavy flow of traffic. The project consisted of a selected Demo on all restrooms, exam rooms,…

Vilano Beach Boat Ramp Dock Repairs

RUSH Construction Inc. D.B.A. RUSH Marine self-performed the work scope associated with this project. Scope of Work included removing two 60’ floating docks, two 24’ long aluminum walkways and replacing with similar new components. The project was expected to take 16 weeks for delivery with 60 days allowed for construction. Total contract time allowed was…

CPA Cove Embankment Repairs – Milliken’s Site

RUSH Marine was awarded this project as part of our CPA Continuing Services-Waterside contract. We self-performed all of the work for this project. These repairs were due to previous hurricane related weather conditions. RUSH Marine furnished the labor, materials, and marine equipment necessary to remove and repair approximately 200 LF of slope embankment within the Canaveral…

Rebuild East Abutment Protection – Jay Jay Railroad

​Location: Kennedy Space Center Owner: NASA Duration: 12 Days Contract Value: $700,000 General Scope: Provide emergency repairs and install two replacement pile bents at the Jay-Jay Railroad Bridge. This critical project had a 28-calendar day schedule. Through extensive coordination and expediting efforts, equipment was mobilized, materials were procured and work was completed ahead of schedule.…

Legacy Academy Charter School

RUSH Construction re-purposed a former Publix grocery store into Phase 1 of a new charter elementary school. The 45,000 SF former grocery space was transformed into the Legacy Academy Charter School, with classes for elementary aged children scheduled to begin in August of 2018. Phase 1 will be open August 2018 with room for future…

DaVita Healthcare at Titus Landing 3rd Floor

Project Location: Titusville, FL Facility size: 2,153 SF Build Out Duration: 5 Months Owner: DaVita Healthcare Partners d/b/a Total Renal Care, Inc. RUSH Construction (RUSH) served as the general contractor for the interior build-out of a portion of the Parrish Healthcare Medical Office Building at Titus Landing (also constructed by RUSH Construction, Inc.). The new…

Apollo Surgery Center Build-Out

RUSH Construction served as the Contractor and provided some additional Design-Build options for the build-out of the second floor 9,850 s.f. over the existing operational Surgery Center. This AHCA compliant project consisted of creating three (3) more operating rooms and all the required departments and equipment needed to support this service. This Build-Out also included…

Shuttle Landing Facility Fuel Farm Storage

RUSH was awarded the installation of a 20,000-gallon Jet-A fuel storage tank on the apron of the former Shuttle Landing Facility. The project consisted of site work, a spill containment area, bollards to protect the fuel tanks, and associated electrical work to tie the new system into the existing electrical system. The tank allows the…