NASA Corrosion Control Repairs, Tower M6-0791D
Design/Build project to provide corrosion controls repairs for NASA’s Radio Tower located at Building M6-0791D.
Design/Build project to provide corrosion controls repairs for NASA’s Radio Tower located at Building M6-0791D.
Beginning at 10:30 AM on March 5th, the ceremony will feature a showcase of recent improvements by RUSH Construction, Inc. and RUSH Marine, with the ribbon cutting scheduled for 11:15 AM.
The Ron Norris Honda Dealership project located along Highway US 1 in downtown Titusville was a three-phase, design-build project constructed concurrently with the Ron Norris Buick/GMC Dealership project. The design and construction of the 20,000 square foot Ron Norris Honda Dealership was modeled to Honda’s Gen 3 Image Program governed by Interbrand Design Forum. RUSH…
The Ron Norris Buick/GMC Dealership project located along Highway US 1 in downtown Titusville was a three-phase, design-build project constructed concurrently with the Ron Norris Honda Dealership project. The design and construction of the 15,000 square foot Ron Norris Buick/GMC Dealership was designed to the standards published by Gensler, the architectural agency which represents for…
The Parrish Healthcare Center at Titus Landing is set to open in 2017 and will be an integral part of the city’s new retail and medical complex built on the site of the old Miracle City Mall. The 60,000 square-foot, three-story building will include a diagnostic center, physician’s offices, and a dialysis suite.
RUSH Construction has operated a satellite office with 6 full time staff members at MacDill AFB since 2004. RUSH has completed multiple projects at MacDill, and is proud to to continue working there, supporting our troops and contributing to national security by assisting the government with a multitude of important projects. We currently have 17 Task Orders in progress.
RUSH Facilities has become a state-licensed HVAC Contractor which expands our offerings to provide HVAC services to new and existing clients. By receiving this license, RUSH Facilities moves beyond routine HVAC services with the ability to perform HVAC unit replacements, upgrades, and major repairs utilizing our own in-house staff.
RUSH Marine has been awarded as the General Contractor to install the substructures for the new Santa Maria Restaurant in St. Augustine, FL. The project will consist of installing prestressed concrete pile, concrete caps/grade beams, and the pre-cast deck slabs. Construction is anticipated to be completed by May of 2021.
On Friday, October 16th, 2020, RUSH Construction joined with local leaders to break ground on the Eternal Flame at the American Police Hall of Fame in Titusville, FL. The Eternal Flame will be a 10-story infinity symbol featuring a blue rose with a ten foot tall flame blazing from its petals. The flame will burn continuously 24/7…
RUSH served as Design/Build Contractor for Heath First-HRMC MRI Renovation, Health First inquired with RUSH on how to get the 17,000 lb MRI Old Magnet out and the New Magnet into the Facility approximately 140 feet into the heart of the Hospital where the Imaging Department is located. The existing corridor was not an option…