Orlando Health PAL Wekiva

RUSH Construction served as the Design-Build General Contractor in the demolition, construction, and build out of the new Orlando Health PAL Offices at Jamestown Place. This 4,825 square feet build out was constructed in combined three (3) unit existing tenant spaces located in the shopping center. The facility is now used as a physician practice…

Orlando Health Imaging Center

RUSH Construction served as the Design-Build General Contractor for the new outpatient imaging center for Orlando Health Imaging Center located at 1800 Orange Avenue. The facility is 7,500 square feet, with initially anticipated exterior materials being EIFS on metal framing with tinted, insulated glass and conditioning via new roof-top air handling unit(s). The project includes…

Cruise Terminal #1 South Parking Expansion

RUSH Construction, Inc. served as the General Contractor for the CT#1 South Side Parking Lot for the Canaveral Port Authority. This project consisted of the demolition, grading, paving and striping of a new 251-space parking lot, complete with new lighting, security fencing, cameras, and landscaping. The new parking lot allows for additional parking as the…

RUSH Marine – Shore Stabilization of Area 1, MCSF Blount Island – Jacksonville, FL

RUSH Marine, LLC was awarded the Shoreline Stabilization of Area 1, MCSF Blount Island project in Jacksonville, FL. This project included clearing and grubbing, excavation, security fencing and relocation, steel sheet pile bulkhead wall with tie-back system, geotextile fabric, crushed aggregate road, backfill and compaction, sodding, planting and establishment of trees and other work incidental…

Orlando Health, Inc.

RUSH served as the Design Builder for two (2) medical suite renovations located at Lucerne Medical Center/Orlando Health in Orlando, Florida. Suite 405 was reconfigured for pediatric behavioral health offices. Suite 600 was reconfigured for use as a neuroscience clinic. The combined square footage of both suites is 6,072 SF.